The six steps

  1. First conversation and site visit

    We visit the house, listen to what is not working, and talk frankly about budget range and timing. If we are not the right fit, we say so and suggest who might be.

    What you have at the end: A short written summary of the visit and a proposed design agreement.

  2. Design agreement and concept

    A fixed-fee design agreement starts the work. We measure, draw the existing house and present two or three concept options, each with a cost range.

    What you have at the end: Existing-condition drawings and priced concept options.

  3. Design development and fixed price

    The chosen concept is developed into detailed drawings and selections. Our estimator prices each stage from trade quotes, so the design and the budget move together.

    What you have at the end: A complete drawing set, a selections schedule and a line-item fixed price.

  4. Permits and pre-construction

    We submit permits, coordinate engineering, order long-lead items and plan site protection, so construction starts with materials confirmed.

    What you have at the end: A construction schedule, permit status and confirmed lead times.

  5. Construction

    One site lead runs the job from demolition to final inspection. You get a weekly site meeting, photographs and a shared schedule. Any change is priced in writing before it happens.

    What you have at the end: Weekly updates and written change orders, never verbal ones.

  6. Walkthrough and aftercare

    We walk through every system, finish the punch list, hand over manuals and finish schedules, and return for a planned check-in after the first year.

    What you have at the end: A handover binder, a punch list closed in writing and a one-year visit.

How long will it take?

Choose a project type to see typical ranges for each stage. They are illustrative: your schedule depends on the house, how quickly selections are made, and current permit review times. Stages often overlap; they are shown separately for clarity.

Typical ranges in weeks, for all project types
Project typeDesign and pricingPermit reviewOrdering and preparationConstructionOverall
Kitchen4–62–62–48–12about 3.5 to 6.5 months
Primary bath4–62–62–36–10about 3 to 6 months
Whole-home renovation8–126–123–520–32about 8.5 to 14 months
Addition or casita8–128–163–516–26about 8 to 13.5 months
Custom home16–2410–204–652–72about 19 to 28 months
Printed floor plans with pens, a tape measure and a leather case

How the price is set and kept

During design development our estimator prices the project from real trade quotes. When the drawings and selections are complete, you receive a line-item fixed price. Anything not yet chosen is listed as an allowance with a stated budget.

Allowances

If a final choice costs more or less than its allowance, the difference is added or credited in writing. You can see every allowance in one schedule.

Changes

Changes during construction are welcome, but each one is priced and approved in writing before the work is done. Nothing is added to the bill after the fact.

Payments

Payments follow completed stages of work, so you never pay far ahead of what has been built.

What working with us looks like each week

One site lead
The same person runs your project from demolition to final inspection and is your first point of contact.
A weekly site meeting
Progress, decisions needed, and the next two weeks of the schedule, on site or by video.
A shared schedule
You can see what is happening this week and what needs to be decided before it causes a delay.
Written records
Change orders, selections and inspection results are written down and shared, never left to memory.